Original Research Paper Engineering

Resource Balancing to Enhance Productivity At Earthmoving Equipment Manufacturing Company

Mamatha.K Mr.H.V.Vasuki Mr.Jagadish Mogaveera.B Dr.C.K.Nagendra Guptha

Abstract

This paper focuses on production enhancement of a particular model, to meet the customer demand in the
fabrication department of welding process using the lean approach of resource balancing. The optimum allocation of resources in terms of man power deployment at each workstation is considered and the actual time required to
process at each workstation is determined using time study. Also, the number of manpower required to meet the lean rate
of production enhancement at each workstation and the standard time of each process is determined. Hence, implementation of this method will result in production enhancement and process improvement.

Keywords: Resource balancing, Time study, Takt time, Cycle time