An optimal method to find critical path in fuzzy project networks
V. Sireesha, N. Ravi Shankar
Abstract :
In this paper a new approach to determine the critical path in a fuzzy project network based on the maximum total float of the path is proposed. The advantage of the proposed method is explained through a numerical example and compared with existing methods. The comparisons reveal that the proposed approach is an improved method over existing methods and more efficient in finding the critical path.
Keywords :
Article:
Download PDF
DOI : 10.36106/ijsr
Cite This Article:
V.Sireesha, N.Ravi Shankar An optimal method to find critical path in fuzzy project networks International Journal of Scientific Research, Vol : 2, Issue : 8 August 2013
Number of Downloads : 1264
V.Sireesha, N.Ravi Shankar An optimal method to find critical path in fuzzy project networks International Journal of Scientific Research, Vol : 2, Issue : 8 August 2013
Our Other Journals...
-
Indian Journal of
Applied Research Visit Website -
PARIPEX Indian Journal
of Research Visit Website -
Global Journal for
Research Analysis Visit Website