An optimal method to find critical path in fuzzy project networks

V. Sireesha, N. Ravi Shankar

Abstract :

In this paper a new approach to determine the critical path in a fuzzy project network based on the maximum total float of the path is proposed. The advantage of the proposed method is explained through a numerical example and compared with existing methods. The comparisons reveal that the proposed approach is an improved method over existing methods and more efficient in finding the critical path.